Ensync Technology
Ensync Technology
  • Home
  • Solutions
  • Industries
  • Case Studies
  • Process
  • About
  • Contact Us
  • More
    • Home
    • Solutions
    • Industries
    • Case Studies
    • Process
    • About
    • Contact Us

  • Home
  • Solutions
  • Industries
  • Case Studies
  • Process
  • About
  • Contact Us

Real Projects. Real Results. No Fluff.

 Every case study below represents a real multifamily project delivered by Ensync Technology — on time, on budget, and with zero scope gaps. 

Case Studies Highlight

Mixed-Use Development, Orlando, FL 304-Unit Class A Multifamily

 Challenge: A multifamily developer needed a fully coordinated low-voltage design during pre-construction to avoid costly change orders and delays during the build phase. Previous projects had suffered from disconnected systems and last-minute technology decisions that resulted in expensive rework.


Solution: Ensync was brought in during pre-construction to deliver a complete low-voltage design package coordinated directly with the GC and architect. Our scope included structured cabling, access control, and WiFi backbone — all designed together before a single wire was pulled.

· Full low-voltage design package delivered pre-construction 

  • Direct coordination with GC and architect throughout design phase 
  • Contractor buyout managed by Ensync — competitive bids, apples-to-apples comparison 
  • On-site presence during all critical installation phases 
  • Final commissioning and owner turnover completed at certificate of occupancy


Results: 

  • Zero technology-related change orders throughout construction 
  • Project delivered on time and on budget 
  • Infrastructure designed and ready for future ISP expansion 
  • Ownership team reported seamless technology handover at opening

Value-Add Renovation, Tampa FL 298-Unit Class A Multifamily

 Challenge: An existing garden-style multifamily community was experiencing high resident turnover driven by poor internet reliability and outdated access control. The ownership group needed a technology partner who could upgrade the entire property infrastructure with minimal disruption to current residents.


Solution: Ensync conducted a full technology assessment of the existing infrastructure before recommending a phased upgrade approach that minimized resident disruption. We managed the full scope from design through installation — upgrading connectivity, access control, and telecom infrastructure across all buildings.

· Full property technology assessment completed before any work began 

· Phased installation schedule designed around resident occupancy 

· Property-wide WiFi upgrade across all buildings and common areas 

· Smart access control system replacing outdated key-based entry 

· Structured cabling redesign to support current and future technology needs


Results: 

  • Resident satisfaction scores improved significantly post-upgrade 
  • Service complaints related to technology reduced by over 40% 
  • Property successfully repositioned to support premium rent pricing 
  • Ownership reported improved leasing velocity following technology upgrades

New Construction, Miami, FL 354-Unit Class A Multifamily

New Construction, Miami, FL 354-Unit Class A Multifamily

 Challenge: A large mixed-use development with residential, retail, and amenity spaces across multiple building types needed a single accountable technology partner to manage a complex low-voltage scope. Previous projects of this scale had suffered from vendor fragmentation — different contractors for different systems, nobody coordinating the full picture.


Solution: Ensync served as the single point of accountability for all technology scope across the entire development. We designed, coordinated, and delivered every low-voltage system — from residential units to retail spaces and shared amenity areas — as one integrated, seamless solution.

  • Unified low-voltage design across all building types and use cases 
  • Single point of contact for ownership, GC, and all technology subcontractors 
  • Separate network zones for residential, retail, and amenity spaces 
  • Coordinated access control across all building entry points 
  • Full contractor buyout managed by Ensync — 18% cost reduction vs. initial bids


Results: 

  • Scope gaps eliminated across all building types 
  • Telecom costs reduced by 18% through Ensync's competitive buyout process 
  • All systems fully integrated and operational at certificate of occupancy 
  • Ownership cited Ensync's coordination as a key factor in on-time delivery

Your Project Could Be Next

 

These case studies represent just a sample of the work Ensync Technology delivers across the Southeast. Every project is different — but our commitment to zero scope gaps, full accountability, and on-time delivery never changes.

Whether you're breaking ground on a new development or upgrading an existing community — we'd love to hear about your project.

Schedule a Free Consultation

By the Numbers

  • 3+ — Florida markets served
  • Zero — Scope gaps on delivered projects
  • 18% — Average telecom cost reduction
  • 100% — On-time project delivery

Ready to add your project to this list?

 Let's talk about what Ensync can deliver for your next development. 

Request a Free Consultation!

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept